Project Overview
As part of the Building 253 laboratory reactivation project at RMIT University’s Bundoora East Campus, existing stairways required new handrails and balustrades to improve safety while complementing the building’s interior. The project involved straight and switchback staircases, requiring a solution that could accommodate varying stair angles, changes in direction and landings.
Moddex Solution
Moddex supplied and installed Conectabal® PF30 perforated panel balustrade system, featuring a single inline handrail and top mounted configuration tailored to the stair measurements. The pre-engineered system incorporated aluminium perforated infill panels, configured to accommodate stair angles and tight transitions while maintaining a consistent architectural finish. Finished in Dulux Duratec Territory Red powder coat, the system delivers a distinctive, contemporary appearance while providing durable protection, partial visibility and airflow throughout the stairways and landings.