KEY FEATURES
OF KLIPTREAD™

  • Clip-on installation with no drilling or welding Clip-on installation with no drilling or welding

    Attaches directly to bridge structure, eliminating hot works, structural modification and complex installation processes.

  • Prefabricated flat-pack kit for rapid installation Prefabricated flat-pack kit for rapid installation

    Supplied in modular sections for efficient transport and installation, reducing time on site and speeding up to hours not days.

  • Installation from above the structure Installation from above the structure

    Designed to be installed from above the structure, it eliminates need for scaffolding, site drilling, or hot works.

  • Guaranteed Regulatory Compliance Guaranteed Regulatory Compliance

    Fully pre-engineered, type-approved system supplied with compliance certification with AS/NZS 1657 standards for immediate, foolproof compliance sign-off.

  • 50-year design life 50-year design life

    Engineered for long-term durability across infrastructure environments.

APPLICATIONS & USE CASES OF KLIPTREAD

Configurations

View materials:

Compliance

The Moddex KlipTread™ Clip-On Walkway and Handrail System has been designed to comply with:

AS/NZS 1170.1 – TABLE 3.3AS/NZS 1170.1 – TABLE 3.3
B1 of the New Zealand Building CodeB1 of the New Zealand Building Code
NZS/AS 1657:2018 – CL6.1NZS/AS 1657:2018 – CL6.1
NOTE: PS1 documentation available upon request.NOTE: PS1 documentation available upon request.

Specifications

All relevant technical documents, product specifications and compliance information for Kliptread™ pre-engineered modular clip on walkway and handrail systems are available below. These resources support design development, product specification and accessibility compliance requirements across Australia and New Zealand.

Additional Info

KlipTread™ is a proprietary Moddex system currently used exclusively throughout New Zealand, where it has supported a range of rail infrastructure upgrade projects with KiwiRail, alongside whom the system was originally developed.

View some of the New Zealand bridge infrastructure projects utilising our KlipTread™ product:

Bridge 22 Project
Bridge 127 Project
Bridge 12 Project

Find out more information about KlipTread here

Trials of the KlipTread™ system are currently underway in Victoria, Australia.

FREQUENTLY ASKED QUESTIONSABOUT KLIPTREAD™

Common questions about Kliptread™ clip-on platform and handrail systems, including compliance, NCC and NZBC requirements and considerations for specifying modular walkways, platforms and handrails on bridge infrastructure.

  • Is KlipTread compliant with Australian Standard AS 1657?
  • Is KlipTread an NZS 1657 compliant walkway system?
  • Is KlipTread approved for use on the KiwiRail network?
  • Does KlipTread require structural drilling or welding to install?
  • Can KlipTread be retrofitted to existing, non-compliant bridges?
  • Do I need scaffolding to install the KlipTread system?