Project Background
In July 2016, the first stage of the missing link in the shared pathway network of Central Coast, New South Wales, was complete.
The first section of pathway improves safety and transport links for cyclists and pedestrians, it also allows for better access to the Wyrrabalong National Park – further promoting active tourism in the area.
The Magenta path will eventually stretch for 5.5km from The Entrance North to Evans Rd, Noraville. Furthermore, it will ultimately connect 32km of linked pathways from Tuggerah Station to Blue Haven.
Moddex supplied and installed bikeway barrier across block walls, boardwalk and culverts.
Products/configurations used on project
- Bikeway Barrier Bikesafe BS20 & BS40
Why was Moddex product selected?
Moddex Bikeway Barriers are designed to align with Austroads Guide to Road Design Part 6A and 6B – providing the ultimate protection for cyclists travelling at speed.
Moddex supplied both full and partial offset barriers for protection across culverts, boardwalks and along block walls. Both configurations also have a smooth deflection rail for Austroads compliance and injury prevention.
Moddex was also able to bring value to the client by supplying and installing the complete package through our Project Management service delivery solution.