Malabar Wastewater Treatment Plant

LOCATION

Malabar, Sydney NSW

Client

Brolton Group, contracted by Sydney Water

INDUSTRY

Water

Products Used

Tuffrail® - Industrial Handrails TR25,

Our Products

Net Promoter Score

Moddex’s Score is 93%
Global Industry Average is 51%

Project Background: 

At Moddex, we love sharing our portfolio to showcase our modular systems on large scale infrastructure projects.

Moddex was contracted by Brolton Group in alliance between Sydney Water, John Holland, UGL Engineering and GHD, to undertake the installation of our modular systems as a part of the major upgrades of the Malabar Wastewater Treatment Plant (WWTP).

Starting in 2014 and finishing Mid-2020, the upgrade was successful in securing greater capability and reliability of the Wastewater Treatment Plant, resulting in higher-quality bio-solid waste.

The result of the upgrades has led to a reduction in ongoing operating costs and improved workplace health and safety conditions, whilst securing regulatory compliance with environmental protection licence requirements well into the future.





Built Tough and Under Control

Fully compliant under the provisions of AS 1657.2018 and NZS 1657.1992, Moddex’s Tuffrail® Industrial Handrails and Conectabal® Commercial Balustrades were the products of choice for upgrades of the Malabar WWTP.

Engineered to withstand extreme conditions and guarantee compliance, our systems are built tough and designed to fit together seamlessly. The modular design of our systems means that they are fully modifiable to fit perfectly in and around any space.

As the smartest modular system on the market coupled with streamlined no-weld construction methods, Moddex provides absolute peace-of-mind.  All of these factors combined equate to the lowest total cost of ownership in the industry.





Why was Moddex product selected?

Moddex has gained an industry reputation for our progressive and efficient ‘turn key’ mode of operation, where everything fits together, ensuring compliance and affirming certainty every step of the way. We have been fine-tuning our operating systems and processes for years to align with the adaptable and streamlined nature of our modular barrier systems.

Moddex was selected because we methodically deliver certainty when it comes to compliance and safety. With a fast, no-weld installation, our modifiable modular systems are renowned for providing an adaptable and durable solution for all barrier needs in major infrastructure projects.

At Moddex, everything fits.

Get in touch with our expert team, call us on 1800 663 339 (Australia) or 0800 663 339 (New Zealand) or download our product brochure.

We’re here to help, whether you need a quote, technical advice or tender support.

LOCATION

Malabar, Sydney NSW

Client

Brolton Group, contracted by Sydney Water

INDUSTRY

Water

Products Used

Tuffrail® - Industrial Handrails TR25,

Our Products

Net Promoter Score

Moddex’s Score is 93%
Global Industry Average is 51%

Products Used

  • TR25
    Top & Mid Rail | Toeboard. Featuring Tuffgard Toeboard For level or rake applications with open access beneath, where an object could fall from a platform, landing or structure