Project Background
Brisbane City Council identified a potential hazard to pedestrians with an existing flight of concrete stairs at Crosby Road, Ascot QLD. Elite Retaining Systems were awarded the contract for the removal and replacement of the stairs for compliance with today’s height safety standards.
Working in conjunction with Elite Retaining Systems, Moddex provided fixed pedestrian handrails to comply with AS 1428.1-2021.
Products/configurations used on project
Connectabal CB30
Assistrail AR30
Why was Moddex product selected?
The complex design of the replacement stairs demanded a flexible solution on-site. Our modular proprietary systems delivered on this flexibility with guaranteed compliance to AS 1428.1-2021.
To account for minor adjustments required during the installation process, some stanchions were cut to size on-site.
A full installation drawing pack was issued with the product, enabling a smooth and efficient self-installation process for the client without the cost of specialist trades.