Project Background
Construction of the new Bayswater Station took place during April 2017 and was completed in May 2018.
The Mountain Highway, Bayswater level crossing was removed by lowering the rail line below Mountain Highway. The new station precinct incorporates walking and cycling paths which connect Mountain Highway to Scoresby Road and linking in to the wider bike path network.
Moddex was contracted by Melbourne Chain Wire to conduct a site measure and supply handrail for a pedestrian ramp within the Station precinct.
Products/configurations used on project
- Disability Handrail Assistrail AR60
- Disability Handrail Assistrail AR150 retrofitted to existing fence