Central Station

LOCATION

Haymarket, NSW 2000

Client

Laing O’Rourke

INDUSTRY

Rail

Products Used

Project Background

During 2018, NSW Transport Minister announced Laing O’Rourke would build the new Sydney Metro platforms at Central and Central Walk.

As part of the $955 million project to renew Australia’s busiest commuter hub, Moddex was approached mid-2018 to deliver a handrail and balustrade solution that achieved stringent crowd-loading ratings.

Why was Moddex product selected?

Timing was crucial on this project. Moddex was requested to install the handrails for this public transport project in a narrow window. The pre-engineered, modular system enabled installation lead time to be significantly reduced.

The no-weld solution also eliminated the need for costly, disruptive hot works permits, on-site cutting and welding. Which also meant less noise disturbance and no toxic welding fumes in the public space.

Products/configurations used on project

  • Industrial Handrail Assistrail AR150
  • Commercial Balustrade Conectabal CB30

Read More about this project here>